Public EV Charging Solutions

Seamless payment

Automated, unmanned operation with full support fo a frictionless charging experience for every driver.

Maximizing ROI

Injet‘s solution integrates advanced technology to optimize grid capacity and ensure your station remains profitable 24/7.

Reliability

Engineered for the UK climate with IP54 protection ratings. Our DC fast charger features an integrated display for advertising, enabling multiple revenue streams.

As the UK moves toward Net Zero, ev charging public infrastructure has become a strategic necessity for businesses from retail parks to destination hotels. We provide the expertise and OZEV-approved technology to turn your parking space into a high-performance profit center.

From ensuring Reliability & Uptime in the British climate to Maximizing ROI with smart DLB technology and Seamless Payment options, we provide everything you need to run a successful, 24/7 profitable operation.

How we achieve seamless payment?

OCPP

As an official OCA member, we support the latest OCPP 2.0.1 protocol to ensure future-proof interoperability and advanced network management

Through our partnership with Hubject, we are ready to implement ISO 15118 to deliver a true ‘Plug & Charge’ experience for effortless, automated payments

Things you should know regarding ROI

Idle Power: The Hidden Revenue Leak in Public Charging

In today’s public charging infrastructure, power is often underutilised due to fragmented system design.

A typical high-power site may have significant grid capacity available, yet large portions of it remain unused. While some vehicles demand maximum charging power, others—already near full charge or limited by onboard systems—consume far less.

Because traditional systems cannot dynamically redistribute power across units, this creates isolated “power islands,” where idle capacity cannot be redirected to where it’s needed most.

The result?

Operators pay for full grid capacity but fail to monetise it—leading to lost throughput, reduced efficiency, and invisible revenue loss during peak demand.

Maintaining high uptime remains a critical challenge in public charging infrastructure.

On the hardware side, inconsistent component quality and complex system integration often lead to unpredictable failures. As charging networks scale, these risks multiply—resulting in increased maintenance, downtime, and operational uncertainty.

On the software side, many suppliers rely on third-party PLC chips and external communication modules. This lack of full system control can introduce compatibility issues, delayed fault response, and limited optimisation capabilities.

The result?

Reduced charger availability, unstable user experience, and lost revenue from avoidable downtime.

How injet fixed this?

1. Smart Power, Fully Utilised

Powered by Injet’s proprietary architecture and algorithms, our dynamic power distribution technology enables true site-level power scheduling—maximising utilisation and unlocking the full value of your grid capacity.

2. Built for Reliability, Designed for Uptime

With full in-house design from PCBA to PLC chips, we ensure seamless vehicle-charger communication, while a modular programmable power controller allows core component replacement within just 15 minutes—minimising downtime and keeping your chargers online.

Reliability

ip54 dc fast charger

Built for the British Weather

High-grade IP54 protection ensures reliable performance in rain, wind, and damp conditions.

dc fast charger with screen

Boost Your Branding

Optional integrated digital screens to showcase advertisements and maximise site revenue.

Products

injet ampax dc fast charger

Ampax

up to 320kw Standalone DC fast charger

Injet Ampax

Injet-Exclusive PPC & optional 32" HD Ad Screen. The industry’s most reliable high-power solution for maximized ROI.
Learn more
injet 480kw dc fast charger

Ampax Pro

480kw Standalone DC fast charger

Ampax Pro

Enhanced PPC & 32" Screen with upgraded Cable Management & DLB. Smarter power distribution for premium charging hubs.
Learn more
Injet Hub 30-40kw DC Electric vehicle charging station

Hub

Wall-mounted 30kw fast dc charger

Hub

The thinnest 20-40kW DC charger on the market. Single-person installation for unmatched setup speed and efficiency.
Learn more

Related Blogs

Injet HanHui 480 DC fast charger with electric car at highway charging hub

I’ve had the same conversation with a lot of charging site developers over the past few years. They’ve secured the grid connection, chosen a location with good traffic visibility, signed

Injet HanHui 480 dual-connector DC fast charger simultaneously charging two electric vehicles

How to Choose a DC Fast Charger for Your Commercial Fleet | Injet Charger

Fleet electrification in the UK is accelerating — driven by the ZEV Mandate, expanding Clean Air Zones, and the operational economics of running electric vehicles at scale. But the dc

AFIR official introduction

Driving Your EV to Europe? Why the New AFIR Rules are a Game Changer for Your Next Road Trip

If you’ve ever planned a long-distance road trip from the UK to the European mainland in an electric vehicle, you’ll know the specific brand of anxiety that comes with it.

Injet Ampax 150kW charging station installed at a motorway service area, providing high-speed DC fast charger services for long-distance EV travel.

The 99% Uptime Rule: What Every UK Charge Point Operator Needs to Know

In the UK’s rapidly evolving EV landscape, the benchmark for success has shifted from “how many plugs” to “how many are actually working.” For charge point operators (CPOs) and fleet

Injet Ampax modular design dc ev charger

The Hidden Cost of Traditional DC Chargers — And How Integrated Design Fixes It

For UK site hosts and fleet operators, the “True Cost of Ownership” for a DC fast charger isn’t just the purchase price—it’s the reliability and serviceability over its 10-year lifespan.

Frequently Asked Questions (FAQ)

Q1: Is the Injet Eco Smart fully compliant with the latest UK Smart Charging Regulations?

A: Yes. The Injet Eco Smart is fully compliant with the Electric Vehicles (Smart Charge Points) Regulations 2021. It features mandatory security encryption, randomized delay, and default off-peak charging to ensure your home charging is safe, secure, and grid-friendly.

A: No. Thanks to its built-in PEN Protection (Protective Earth Neutral), the Injet Eco Smart does not require an additional earth rod. This significantly simplifies the installation process and reduces the overall cost by eliminating the need for ground excavation.

A: Absolutely. The Eco Smart supports Solar Integration, allowing you to prioritize charging your EV with surplus energy generated from your solar panels. You can manage these settings easily via the “WE-E Charge” app to maximize your use of free, green energy.

A: Yes, Injet is an OZEV-approved manufacturer. The Eco Smart model is eligible for the current UK government grants (such as the £350 grant for flats and rented accommodation) when installed by an OZEV-authorised installer.

A: The Tethered version comes with a fixed 5-meter or 7-meter Type 2 cable attached, offering maximum convenience. The Untethered (Socket-only) version provides a sleeker look and allows you to use your own Type 1 or Type 2 charging cable

Ready to start operating your own charging station?

We are waiting for you!